IOTA Group - Nigeria·Anambra, nigeria·Full Time·Contract
ManufacturingFull TimeContract
-
Job Description
To oversee the construction management of PPI project in Nigeria. The aim is to extend and upgrade five existing highvoltage (HV) electrical substations as a turnkey project.
This technical service will be carried out in Nigeria.
This location could be changed according to the progress of the work and the project needs.
Main Goals
Represent Company Energy for installation, testing and commissioning of 330 MVA, 165 MVA and 60 MVA power transformers.
Ensure safe and compliant installation, testing and commissioning of power transformers.
Support Ready for Commissioning (RFC) and Energization.
Coordinate installation and commissioning interfaces with HV, P&C and Customer teams.
Deliver reliable and fully documented commissioned power transformers.
Deliverables:
Review transformer installation, testing and commissioning procedures, drawings and vendor documentation.
Supervise transformer receipt inspections and verify installation readiness.
Supervise transformer positioning and assembly of bushings, radiators, OLTC and accessories, including vacuum filling and oil filtration, in accordance with OEM instructions.
Supervise transformers turns ratio, winding resistance, vector group and OLTC tests using the OMICRON TESTRANO 600 or an equivalent from OMICRON.
Supervise capacitance/tan delta tests using OMICRON CPC 100 with CP TD1, and SFRA tests using OMICRON FRANEO 800, where required.